    Adding an Extension or Renovating your House: Planning Permissions

    22 April 2020

    Are you looking to renovate your house or add a new extension to it? Well, we all want to make your home beautiful. But, to make some special types of renovations in Ireland, it is required to have some planning permissions from the concerning authorities. For most types of renovations and extensions, you will not have to get permission. However, it is always suggested to have good house insurance before taking any step for your home renovation. So, let’s discuss more this topic below.

    You will not need permission if:

    • You are adding an extension which will not increase the floor area more than forty square metres. Also, the extension should not reduce the backspace to less than 25 metres.
    • You want to convert a rear side attached garage to use for domestic use. It must have a floor area of not more than 40 metres. In other words, any renovation or extension under 25 metres will not require planning permission.
    • Also, the garage shouldn’t be used for living purposes either for humans or pets. While doing a renovation or adding an extension, keeping the extra floor space within 25 metres will not need any planning permission. However, if you are doing it on a large scale outside of these requirements, you must have to go for planning permission. Also, we suggest you opt for good house insurance in Ireland in order to stay away from unwanted damage expenses.

    How to apply for planning permission?

    Getting planning permission for any type of renovation or extension project of your home is pretty simple. However, if not applied properly, you may have to face various problems too. So, in order to get your planning permission, your first step must be to understand and note down your requirements. Once you have done this, make sure to connect with the local planning department regarding the same.

    Once you applied for the permission, it will not take much time to get the approval. However, in some cases, it may take eight weeks until the permission is granted. But, when you take care of the points given below, you will be able to get it done without hassles in a very short time frame. Besides, connect with a good insurance firm to get good home insurance that can cover your damage losses.

    • Place a public notice on Newspaper about the site. This must be done at least five weeks prior to application submission.
    • Fill your planning permission form and submit it to your local planning authority. You must do if about two weeks after the newspaper publication.
    • Pay the required fees, which will vary depending on the type of renovation or extension project.
    • You will receive a receipt after the successful submission. Also, the local authority will get in touch with you to get detailed information.
    • You will receive a notice of permission after everything is done adequately.

    To get everything done properly, make sure to highlight your requirements to the authority in a proper manner. Also, do not forget to keep a good home insurance Ireland before starting your renovation project.